Up Organ Installation Prev Next Slideshow

 Previous image  Next image  Index page  Original Image [DSC_4989.JPG - 2.2MB]
DSC_4953
DSC_4959
DSC_4964
DSC_4968
DSC_4971
  DSC_4989.JPG - Laying out the floor framing, ready to shim up to level (amking up for any unevenness in the concrete floor of the pipe chambers).  
DSC_4990
DSC_4991
DSC_4999
DSC_5005
DSC_5010

Laying out the floor framing, ready to shim up to level (amking up for any unevenness in the concrete floor of the pipe chambers). Download Original Image
Camera: NIKON D200 | Date: 10/7/13 8:04 AM | ISO: 400 | Exp. Time: 1/60s | Aperture: 5.6 | Focal Length: 24.0mm (~36.6mm)
Total images: 314 | Help