Up Organ Installation Prev Next Slideshow

 Previous image  Next image  Index page  Original Image [DSC_6111.JPG - 3.4MB]
DSC_6082
DSC_6088
DSC_6094
DSC_6098
DSC_6109
  DSC_6111.JPG - The facade pipes have arrived in the third tractor-trailer rig.  
DSC_6115
DSC_6116
DSC_6117
DSC_6125
DSC_6126

The facade pipes have arrived in the third tractor-trailer rig. Download Original Image
Camera: NIKON D200 | Date: 10/22/13 8:32 AM | ISO: 400 | Exp. Time: 1/60s | Aperture: 5.6 | Focal Length: 24.0mm (~36.6mm)
Total images: 314 | Help